How many tonnes and bulk bags of MOT Type 1 sub-base you need for a patio, driveway, shed base or path – by compacted depth, with compaction already allowed for.

  • Compacted depth in mm
  • Tonnes & bulk bags
  • Free, no sign-up
MOT Type 1 Calculator
Density: kg/m³
%
Type 1 compacts by about 20%, so a 150 mm finished sub-base needs about 180 mm of loose material – the allowance covers it. Patios and paths: 100–150 mm. Driveways: 150–200 mm. Lay it in 75 mm layers and compact each one.
stonegravelcalculator.com
Sub-base estimate · tonnes & bulk bags
Material–
Area0 m²
Compacted depth–
0tonnes
0 cubic metres
Volume0
Weight0
Bags0 ×
Est. cost–
Add a price for a cost estimate
How this was calculated
Estimate only. Type 1 is about 2.0–2.1 t/m³ when compacted; bulk bag weights vary (750–1,000 kg).
On this page

    MOT Type 1 is the UK’s standard sub-base: crushed limestone or granite graded from 40 mm down to dust (to the Department for Transport’s Specification for Highway Works clause 803 – hence “MOT”), which compacts into a dense, load-bearing layer under patios, block paving, driveways, sheds and artificial grass. It is sold by the tonne loose and in bulk bags of around 850 kg. The thing people get wrong is compaction: Type 1 loses about a fifth of its volume under a wacker plate, so 150 mm finished needs roughly 180 mm of loose material. This calculator works from the compacted depth you want and adds the 20% for you.

    How to use the Type 1 calculator

    1. Measure the area in metres

      Length × width in metres for a patio or driveway, or the diameter for a circle. Add a second area for a path. Measure to the outside of the edging.

    2. Set the compacted depth

      100 mm for a patio, path or shed base on firm ground, 150 mm for patios on clay or for block paving, 150–200 mm for driveways, 200 mm+ where vans will park or the ground is soft.

    3. Choose the material

      MOT Type 1 limestone/granite is the default at about 2.0 t/m³. Recycled Type 1 (crushed concrete) is a little lighter and cheaper. Type 3 is the permeable version for SUDS driveways; scalpings and 6F2 capping are rougher, cheaper fills for deep bases.

    4. Read tonnes and bulk bags

      Tonnes, loose cubic metres, bulk bags and 25 kg bags. The 20% compaction allowance is included – do not add more unless the ground is very soft.

    MOT Type 1 formula

    Compacted m³ = Area (m²) × depth (mm) ÷ 1,000
    Loose m³ to order = compacted m³ × 1.20  ·  Tonnes = loose m³ × 2.0  ·  Bulk bags = tonnes ÷ 0.85

    Example: 6 × 4 m patio, 150 mm compacted Type 1

    1. Area = 6 × 4 = 24 m²
    2. Compacted volume = 24 × 150 ÷ 1,000 = 3.6 m³
    3. Loose volume = 3.6 × 1.2 = 4.32 m³
    4. Weight = 4.32 × 2.0 = 8.6 tonnes = 10–11 bulk bags – at this size a loose tipper load is cheaper

    How much Type 1 do I need? Quick reference

    Area100 mm compacted150 mm compacted200 mm compacted
    5 m²1.2 t · 1½ bulk bags1.8 t · 2 bulk bags2.4 t · 3 bulk bags
    10 m²2.4 t · 3 bulk bags3.6 t · 4¼ bulk bags4.8 t · 5¾ bulk bags
    20 m²4.8 t · 5¾ bulk bags7.2 t · 8½ bulk bags9.6 t · 11¼ bulk bags
    24 m² (6 × 4)5.8 t · 7 bulk bags8.6 t · 10¼ bulk bags11.5 t · 13½ bulk bags
    30 m²7.2 t · 8½ bulk bags10.8 t · 12¾ bulk bags14.4 t · 17 bulk bags
    50 m² (driveway)12.0 t · 14 bulk bags18.0 t · 21 bulk bags24.0 t · 28 bulk bags

    Type 1 at 2.0 t/m³ loose including 20% compaction – i.e. 2.4 tonnes per m³ of finished sub-base, or about 0.24 t per m² per 100 mm. Bulk bags of 850 kg. Above about 8 bulk bags, loose delivery by tipper is usually cheaper.

    Coverage per tonne and per bulk bag

    Allowing for compaction, one bulk bag of Type 1 covers about 3.5 m² at 100 mm finished depth, or 2.4 m² at 150 mm. Loose (before compaction) the same bag spreads over 4.25 m² at 100 mm – which is the figure suppliers usually quote, so do not be surprised when it compacts down.

    MaterialDensitym² per tonne at 100 mmm² per bulk bagm² per tonne at 150 mmm² per bulk bagm² per tonne at 200 mmm² per bulk bag
    MOT Type 1 (limestone / granite sub-base)2.00 t/m³5.04.23.32.82.52.1
    Type 1 recycled (crushed concrete)1.84 t/m³5.44.63.63.12.72.3
    MOT Type 3 (permeable sub-base)1.76 t/m³5.74.83.83.22.82.4
    Scalpings / hardcore1.92 t/m³5.24.43.52.92.62.2
    6F2 / 6F5 capping layer1.84 t/m³5.44.63.63.12.72.3

    Coverage = 1,000 kg ÷ (density × depth in metres); bulk bag taken as 850 kg. Loose material – add 10% for waste and 20% for compacted sub-base.

    Type 1 vs Type 3 vs scalpings vs hardcore

    MaterialGradingDrains?Use
    MOT Type 140 mm to dust, well gradedNo – compacts almost solidSub-base for patios, block paving, driveways, sheds, artificial grass
    MOT Type 1 recycledCrushed concrete / brick, 40 mm to dustNoSame uses, 20–30% cheaper; fine for domestic work
    MOT Type 340 mm, reduced finesYes – permeableSUDS-compliant permeable driveways and paving
    MOT Type 2Like Type 1 with more finesNoLower-spec sub-base, farm tracks
    Scalpings / crusher runQuarry waste, variablePartlyCheap fill, tracks, deep bases under Type 1
    6F2 / 6F5 cappingUp to 125 mm, gradedPartlyCapping layer on very soft ground before Type 1
    HardcoreBroken brick / concrete, ungradedYesBulk fill under concrete slabs; blind with Type 1 or sand

    How deep should Type 1 be?

    ProjectCompacted depthOn top
    Patio (slabs) on firm ground100 mm30–50 mm mortar or sharp-sand bed
    Patio on clay or made ground150 mmSame, often on a membrane
    Block paving – pedestrian100–150 mm50 mm sharp sand laying course
    Block paving – driveway150–200 mm50 mm sharp sand
    Shed or garden-room base100 mmSlabs on sand, or 100 mm concrete
    Artificial grass50–75 mm20–25 mm sharp sand or granite dust
    Gravel driveway150 mm30–50 mm of 20 mm gravel

    Lay Type 1 in layers no thicker than 75 mm, compacting each with a plate compactor (at least 4–6 passes) and damping it lightly first if it is dusty. For the sand layer use the sharp sand calculator; for a mortar bed the sand & cement calculator.

    MOT Type 1 cost (UK)

    A bulk bag of Type 1 costs about £50–£80 delivered (recycled £40–£65); loose Type 1 by the tipper load is £30–£50 per tonne plus £40–£80 delivery, so a 10-tonne load is typically £350–£550 – well under the price of 12 bulk bags. 25 kg bags (£3–£5) only make sense for a very small repair.

    Frequently asked questions

    How many square metres does a bulk bag of Type 1 cover?

    About 3.5 m² at 100 mm compacted depth (around 4.25 m² loose), or 2.4 m² at 150 mm, for an 850 kg bag.

    How much Type 1 do I need for a 20 m² patio?

    At 100 mm compacted: 2 m³ compacted = 2.4 m³ loose = 4.8 tonnes, about 6 bulk bags. At 150 mm: 7.2 tonnes, 8–9 bulk bags – at which point a loose load is cheaper.

    How much does 1 m³ of MOT Type 1 weigh?

    About 2.0 tonnes loose and 2.3–2.4 tonnes once compacted. One tonne is roughly 0.5 m³ loose.

    How many tonnes of Type 1 are in a bulk bag?

    Most bulk bags hold 800–900 kg (about 0.42 m³) despite being called “tonne bags”. Check the supplier’s stated weight – some genuinely hold 1,000 kg.

    How much does Type 1 compact?

    By about 20%. 180 mm loose compacts to roughly 150 mm. This calculator adds that 20% automatically, so enter the finished depth you want.

    What is the difference between MOT Type 1 and Type 3?

    Type 1 is graded with fines so it compacts into a near-solid, non-draining layer. Type 3 has most of the fines removed, so it compacts but still lets water through – it is the sub-base required under permeable block paving and SUDS driveways.

    Written by the Stone & Gravel Team